A Correction Equation Failure
The gradient correction equation procedure is not free from error and can be forced to fail as seen in the following example.
The procedure works correctly for an initial rough estimate of x=2, y=6 for the zeroes of the Condition Equations Φ.
But the procedure fails along the x=y diagonal.
Saturday, March 17, 2018
Least Squares Parameter Fit for the Catenary
This iterative correction for the fit of the parameters for the catenary using the least squares gradient formula works quite well too. The equations of condition for xmin and L are fairly smooth over a wide range as these grid plots show.
And the iteration of the corrections converges rapidly to the optimal values of xmin and L using an initial rough estimate of their values.
Using the formulas for the catenary we can now compute exact values for ymin and y(b).
Friday, March 16, 2018
Proof the Equilibrium Curve is a Catenary
Using smin and σ=A/(gλ) to rewrite the parametric equations for x and y one can eliminate the mass density λ and show that the curve is in fact a catenary.
Supplemental (Mar 16): One can also show that the tension in the string is,
Thursday, March 15, 2018
Is the Equilibrium Curve a Catenary?
Although the parametric equations for the equilibrium curve involve the linear mass density, the fits for A and B don't appear to be affected by changes in the value for the linear mass density, λ. All the values for the minimum agree to 15 decimal places.
At the minimum gλs+B=0 so B=-g λsmin making the argument of the sinh-1u equal to u=gλ(s-smin)/A so there are two parameters, A/gλ and smin appear to be independent.
What we've been calling the equilibrium equations may in fact be the parametric equations for a catenary.
A Convergent Method for Fitting a Suspended Line
The relative linearity of the equations of condition for the fit of the equilibrium curve allows us to use numerical methods for its solution. We can start with a rough estimate and improve on it by using the estimate to evaluate the condition equations and their derivatives and estimating the necessary correction.
This method works quite well.
Wednesday, March 14, 2018
Cobwebs vs Itercepts for Solving Condition Equations
Cobwebs can be used to solve a pair of simultaneous equations but they are notorious for the problems associated with them. In the preceding blog I estimated the intersection point by using a formula for computing where two straight lines will cross.
In the figure below the two lines were fitted using least squares to obtain the coefficients for the linear equations. The values a and a' above are the points where the lines intersect the y-axis with b and b' being the slopes of the lines. The distance of the intersection point from the origin is x.
A simple explanation of the formula is the distance of the intersection point from the origin is the separation of the lines there, Δa, divided by their rate of approach, Δb. As one gets closer to the intersection point the data becomes relatively more linear but eventually one sees more and more relative error in the estimate as one zooms in.
Supplemental (Mar 15): The equilibrium price is a topic discussed in Economics. See the Wikipedia articles on Economic equilibrium and Bayesian game. One can explain the divergent cobwebs as due to the incomplete information that results from basing estimates on past history in a changing market. It's an example of a flaw in the use of Bayes' theorem where current statistics differ from those of the past. Basically what works here doesn't always work there and the situation spirals out of control.
Monday, March 12, 2018
The Curve for a Suspended Line
A while ago I did some posts on the equilibrium position of a weight hanging from zip line and some similar problems. We can also take a look at the curve for a cord or chain hanging freely. Lagrange states that the center of gravity is a minimum when the cord is in equilibrium and the curve is a catenary. Galileo also mentions the hanging line and notes that it closely approximates a parabola. I used the Calculus of Variations to derive a general equation for the catenary assuming the curve has minimal potential energy for a cord with fixed length L.
One can also try to find the curve for a cord in equilibrium by doing a derivation similar to that found in Lamb's Statics.
A comparison shows that the catenary and equilibrium curve appear identical although the equilibrium curve is dependent on the cord's linear mass density λ.
The difficulty in doing the comparison is fitting the curves exactly so the endpoints match up with the chosen positions for the desired length. In each case one has two condition equations that need to be solved for the unknown parameters. For the catenary one can do a two dimensional search for the values of xmin and A but the surfaces F and G do not intersect in a straight line. The Excel plot below shows the rms deviation of the functions F and G for chosen values of the parameters. It's difficult but one can zoom in on the parameters for the minimum.
The parametric equations are a little easier to work with since the surfaces involved are more nearly planar.
One can see that the curves for Δx=0 and Δy=0 are nearly linear and when plotted as points in the A,B plane appear to be two lines crossing each other. A simultaneous solution for the two condition equations requires that the values of A and B be identical for both lines.
In the plot above the center and widths were chosen and Δx and Δy were computed for a grid of points in the A,B plane. Interpolation was used to estimate the positions of the zeros to get the two lines then the set of points for each line were fit to find a linear equation for each line and their intersection was estimated (shown as a grey circle above). By shifting to the estimated intersection point and changing the widths one can more easily zoom in on the intersection point.
One can do a "notch fit" to show how the distance between the two lines varies with the value of B by estimating the intersection of the two segments confirming the "zeros."
The computed minima for both curves agree to 5 decimal places but the parametric equations are easier to work with.